Ann & Robert H. Lurie Children’s Hospital of Chicago
Ann & Robert H. Lurie Children’s Hospital of Chicago, the largest pediatric healthcare provider in Illinois, sought to nearly double its space by creating a new facility on the existing Children’s Memorial Hospital site. We provided schematic, design development, construction document, and LEED analysis services for this 1.7-acre site. The unique geometry of the hospital encompassed approximately 90% of the site. However, 30% of this coverage was cantilevered, allowing for the construction of an arching access drive through the site. Unique challenges included coordinating the location and elevation of the stormwater detention system, emergency generator fuel tanks, and utilities to serve the hospital. The project was awarded the LEED Silver certification and included water quality improvements through the use of a Stormceptor water quality unit.
Owner
Ann & Robert H. Lurie Children’s Hospital of Chicago
Market Sector
HealthcarePrimary Service Lines
Site CivilRegion
ChicagoAdditional Info
Project Highlights
- An existing 6.5-foot public sewer located adjacent to the property line resulted in approximately 28 feet of the eastern portion of the site having to be cut off by installing sheeting to safeguard the existing sewer line.
- Ambulance bay placement necessitated re-striping and coordination of the signal timing.
- Loading dock access is off a newly dedicated Green Alley and public access among existing street networks and hospital structures improved functionality.
- Off-site road improvements included re-striping access and through lanes and relocating and upgrading crosswalks.
- Concrete paving helped reduce the heat island, non-roof effect. A green roof system decreased the heat island effect caused by the building and helped minimize stormwater runoff.
- Extensive permits were required from the City’s Department of Water Management and Department of Transportation.
Related Projects
North Street Reconstruction & Integrated Stormwater Management
The North Street project not only addresses stormwater management but also serves as a catalyst for neighborhood revitalization and economic …
Coleman Property Consolidated Wetland Mitigation Bank
V3 Companies identified and developed the Coleman Property for wetland and stream mitigation, creating a consolidated mitigation bank for a sole …
Righthand Fork Salt-Pipe Creek Restoration
This project delivered dual recreational and ecological benefits with minimal maintenance requirements, ensuring a sustainable and enjoyable …
McArthur Park Redevelopment
This redevelopment project not only upgraded the park’s facilities but also contributed to the overall aesthetic and functional improvement of the …