Jane Addams Memorial Tollway (I-90) Reconstruction
As part of the Illinois Tollway’s $1.6 billion reconstruction of the I-90 East Corridor from the Elgin Toll Plaza to the Kennedy Expressway, our team was responsible for performing Phase I master planning and Phase II design engineering services for the widening and reconstruction of 6.5 miles of Jane Addams Memorial Tollway (I-90). Improvements included a fourth travel lane in each direction, a widened inside shoulder, the reconstruction of three crossroad bridges and two mainline bridges, the full reconstruction of two interchanges (at IL 25 and IL 31), as well as the partial reconstruction of two interchanges (at Beverly Road and IL 59). The project also included the reconstruction of five ramp toll plazas, the installation of retaining walls and noise abatement walls, the implementation of Intelligent Transportation System (ITS) infrastructure, and the relocation/protection of existing utilities, resulting in improved travel conditions.
Owner
Illinois Tollway
Market Sector
TransportationPrimary Service Lines
Highways & Traffic, StructuralRegion
ChicagoAdditional Info
Project highlights:
- This interstate improvement project included Phase II design engineering services for the widening and reconstruction of 6.5 miles of I-90 from the Elgin Toll Plaza to Higgins Road. The project also included the reconstruction and reconfiguration of the Cherry Valley Interchange.
- Seven individual construction contracts – representing a total construction cost of $250 million – were prepared to allow construction of the improvements within the project limits from 2014 to 2016.
- We were also responsible for providing an update to the original 2008 Master Planning Study as well as Construction Management support services for each of the construction contracts.
Related Projects
Elgin O’Hare Western Access (Illinois Route 390 & I-490 Tollway)
The Elgin O’Hare Western Access Project aims to connect Chicagoland like never before. Driven by the need to reduce traffic and enhance access to …
Tri-State Tollway (I-294) Widening & Rehabilitation
Our team was the lead design firm of the Illinois Tollway’s $4 billion improvement of the Central Tri-State Tollway (I-294), an ambitious project …
I-57 at Division Street Interchange Reconstruction
The I-57 at Division Street Interchange Reconstruction project in Manteno, Illinois, aims to address ongoing regional growth and existing geometric …
Bliss Road, Main Street & Fabyan Parkway Intersection Improvements
This award-winning project improved safety and relieved traffic congestion by creating an oval-shaped, single-lane roundabout.